Production Measures

Overview:

This screen is identical to Job Production Measures, except for having to choose the Job and Measure Period fields before being able to enter or see data, as opposed to navigating to the Job first then selecting the production measures ellipsis option. Please refer to the other page for detailed information about this feature.

 

FAQs:

Filter by label

There are no items with the selected labels at this time.

Process Flow:

Â