Overview:

Projects in Upvise are equivalent to https://webwbdoc.atlassian.net/wiki/spaces/DOC/pages/704643078 in Workbench. Projects are one of the core functions in Upvise containing a large amount of data including but not limited to:

  • Daily Diaries (Timesheets)

  • SWMS

  • Site Inspections

  • Toolbox meetings

  • Site Inductions

  • Emergency Response Plans

  • Health and Safety Data etc.

In Upvise Projects, you can also attach documents and photos, organise project milestones, attach and mark up drawings and plans, and schedule staff and equipment to the project https://webwbdoc.atlassian.net/wiki/spaces/UPVISE/pages/1213857949.

They are created in Workbench and automatically imported into Upvise.

 

Project Attachments

To attach a photo or file on your mobile:

  • Tap + in the Project View and select Take Picture

  • Select Take Photo to open your mobile camera and take a picture that will be attached to the Project

  • You can also upload a photo from the Gallery, or link an existing file from Google Drive or Dropbox.

To upload a file or photo in your web account to a PROJECT:

  • Click on the paper clip icon and select Attach File

  • Select a file to upload from your local computer drive, or an existing file to link from Google Drive or Dropbox

  • You can also upload a photo taken from your computer webcam

Files, Photos and Plans are listed in the Project view main screen.

Floor Plans

To upload a PDF Floor Plan in your web account:

  • Click on the paper clip icon and select Upload Floor Plan from PDF

  • Select a PDF floor plan to upload from your local computer drive

Note that you can add annotations (notes, free drawing,...) to Pictures and Floor Plans on your mobile.

Photo’s can be taken against the plan on the mobile.

Marked up Drawings can be added to plans via android devices only (apple does not support this function)

 

Integration

 

Workbench Jobs will sync to upvise as a project as long as the “Req. Sched.” field is ticked in Job Maintenance.

 

To finalise a Project, in workbench you need to tick “finalised” in Job details. The Upvise Project will Auto-archive in the next scheduled sync and no longer will be selectable on forms.

The Req. Sched flag should be retained.

Dates

Where you set a project start date in Workbench “references and dates” job maintenance, this will sync to Upvise as the start date in Upvise.

 

Where the date is set for today or any future date, it will be considered as "Not Started" in Upvise. It will then appear on a "Not Started" project list until the specified date passes. Once the date has passed, it will become available in the live project list.

 

The workbench Site address syncs to the Project address fields in Upvise.

  1. Turn on control parameter “BETA FEATURE - Structured Addresses” by changing the value to “Yes”

    Turns on Structured Addresses within Workbench application and integrations allowing the address information to seamlessly sync to Upvise in the correct Address fields. You will notice now on your workbench Jobs, that the address structure is easier to read and enter data.

2. When selecting "Site Address" on the workbench job, this auto-populates the address fields on the job in workbench 

 

 

  • Alternatively you can manually enter the site address details into the address fields:

    • Street Line 1

    • Street Line 1

    • Suburb

    • City

    • State

    • Country

    • Post Code

  • You can also run a utility “wbUtilityInitialiseStructuredJobAddresses” to bulk populate the addresses from pre-selected site address field.

3. You can also select the “Site Contact” in the addresses tab to update your client contact in the Upvise Project.

4. After the updates have been made for the site address and site contact, click “Save” and then navigate to the upvise integration screen to trigger a sync by clicking “export/Import”. This will occur automatically every hour.

5. In upvise, you will see that the Project address and site contact is now updated, check this by:

  • go to project

  • click “Info”

  • you will see the address and client contact are both updated

see “Map & Geocoding” to geocode your addresses below.

 

  • Workbench Job Status syncs to Upvise Project Stage.

  • Workbench Job Type syncs to Project Group, where there is a setting "Upvise Project Group Sync Basis" where you can switch this to "Profit Centre" instead if needed.

  1. Project Group

  2. Project Stage

See Project/ options:

This can be used for easier filtering on the web and mobile:

Below is the field mapping for Project Integration from Workbench to Upvise.

 

Workbench

Upvise

Details

Job Code

Project Code

 

Description

Name

 

Company

Client Company

Will sync the Company to Upvise if it does not exist (regardless of Other flag)

Start Date

Start Date

Start date is required in order to set dates in Upvise. The start Date defaults to Job Created Date, this will default to Todays Date if not set. Only syncs on new projects

Expected Completion Date

End Date

Defaults to Start Date (as above) + 1 year if not set. Only syncs on new projects

Job Manager

Owner

Can be controlled via Upvise Project Owners Sync Disabled setting 

Job Status

Stage

Stages manually added in Upvise will be overwritten, workbench is the master file for this configuration. 

Job Type OR Profit Centre

Group

Can be controlled via Upvise Group Sync Basis setting

Finalised

Archived

When updating an existing project

Addressing

Street

Structured Addresses Enabled: "StreetLine1, StreetLine2, Suburb". Structured Addresses Disabled: SiteAddress.Address1

 

City

Structured Addresses Enabled: "City". Structured Addresses Disabled: SiteAddress.Address2

 

State

Structured Addresses Enabled: “State” <28/03/2023> add

Site Address Post Code

ZipCode

 

 

Country

Structured Addresses Enabled: "Country". Structured Addresses Disabled: SiteAddress.Address4

Site Contact

Client Contact

Find and replace the contact if any changes are made in WB.

Details

Note

 

Parent Job

Custom Field. (Parent Job) 

Only syncs the Job Code

Stock Location

Custom Field. (Stock Location)

Syncs as Job.StockLocation.JobCode:Job.StockLocation.Description

Activity Group Code

Custom Field. (Activity Group)

 

Jobs- docket cost schedules

Custom Field. (Product Categories) 

This concatinates the schedule codes into a string and is used on data entry for dockets.

Jobs- output schedules

Custom Field. (Output Categories) 

This concatinates the schedule codes into a string and is used on data entry for outputs.