Budget Types
Overview:
Budget Types are used for categorising and reporting on estimation groupings. Workbench comes with several standard types by default, which should be adequate for most needs.
Screen Guide:
To reorder the types into your desired order, simply drag and drop the line to the order you want it to be.
- Budget Type is the displayed label for the type and must be unique.
- Description is an optional longer description of the type if needed.
- Category determines how budge types should be aggregated, and can be one of the following:
- In Current
- Not In Forecast
- In Total
- Inactive shows whether a type is inactive. While inactive, existing data will remain but the type cannot be used in future.
- Plant Type marks this type to be used in Plant Budgets in addition to Job Budgets.
- System Type is a system-only flag, used for contract budgets. this field is not editable.
- Standard Type defines if the type is Standard, and prevents the type from being edited.
Price Requests and Declined budget types
These budget types are available on a budget type picker wherever a budget type filter is present.
On Contract Summary tab, visibility of these types is controlled by whether these types are active or have existing data.
Next Steps:
If you change or add a budget type here, it will immediately be available elsewhere in the system.
FAQs:
Filter by label
There are no items with the selected labels at this time.
Process Flow: