Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Overview:

Budget Types are used for categorising and reporting on estimation groupings. Workbench comes with several standard types by default, which should be adequate for most needs.

Screen Guide:

To reorder the types into your desired order, simply drag and drop the line to the order you want it to be.

  • Budget Type is the displayed label for the type and must be unique.
  • Description is an optional longer description of the type if needed.
  • Category determines how budge types should be aggregated, and can be one of the following:
    • In Current
    • Not In Forecast
    • In Total
  • Inactive shows whether a type is inactive. While inactive, existing data will remain but the type cannot be used in future.
  • Plant Type marks this type to be used in Plant Budgets in addition to Job Budgets.
  • System Type is a system-only flag, used for contract budgets. this field is not editable.

Next Steps:

If you change or add a budget type here, it will immediately be available elsewhere in the system.


FAQs:

Filter by label

There are no items with the selected labels at this time.

Process Flow:


  • No labels