Allows for revenue lines each with a breakdown by the standard types - Activity, Labour, Plant, Stock.
- Add Bill Of Materials allows selection of a defined Bill Of Materials (BOM) item, and the [+] button adds the constituent BOM lines into the selected revenue cost lines.
The revenue line fields specify the following.
- Sequence allows the revenue lines to be ordered.
- Details specifies information or specification about the revenue line being quoted.
- Line Code provides the reference for the revenue line
- Unit is the unit of measurement for this line.
- Qty is the quantity of units being quoted to sell. Updating the Qty after cost lines have been defined will proportional increase the Qty on the sub-grid cost lines.
- Cost Rate is a notional rate from the cost lines as revenue Total Cost / revenue Qty.
- Total Cost is the calculated total of the cost Total Cost fields.
- Markup% is the cost markup to be applied to sell, as displayed in Selling Rate.
- Selling Rate is the result of the Markup% applied to the Total Cost.
- Total Sell is the revenue Qty multiplied by the revenue Selling Rate field.
- Margin% is calculated as (Selling Rate - Cost Rate) / Selling Rate.
- Activity availability depends on the Activities in the global list as well as the Activity Group selected for the Job in Job Maintenance.
- Work Centre will need to be selected from the Work Centres available.
- Description will default based on the Activity selection, but can be modified.
The sub-grid cost line are the cost constituent of the revenue line and the fields specify the following.
- Details specifies information or specification about the cost line being quoted.
- Type of cost line being either Activity, Labour, Plant, Stock, and Catalogue.
- Line Code provides a line Type specific picker for the cost:
- Activity type has Activity picker
- Labour type has Employee Class picker
- Plant type has Plant picker
- Stock type has Stock Item picker
- Catalogue type has Catalogue Line picker for Docket Cost Schedules, and Supplier Catalogues
- Plant Rate is only used for cost lines of Plant type, and lists the defined rates for the plant.
- Unit is the unit of measurement for this cost line.
- Qty is the quantity of units of cost being quoted.
- Cost Rate defaults based on the Line Code selection but can be modified to what you believe is most accurate.
- Total Cost is the cost Qty multiplied by the Cost Rate fields.
- Markup% is the cost markup to be applied to sell, as displayed in line Selling Rate
- Selling Rate is the result of the Markup% applied to the Total Cost.
- Total Sell is the cost Qty multiplied by the line Selling Rate field.
- Margin% is calculated as (Selling Rate - Cost Rate) / Selling Rate.
- Activity availability depends on the Activities in the global list as well as the Activity Group selected for the Job in Job Maintenance.
- Work Centre will need to be selected from the Work Centres available.
- Description will default based on the Activity selection, but can be modified.