Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview:

This list provides logs related to plant maintenance and you can now find these under the Plant module together with all the other Plant screens.

This screen includes creating a new log by dragging and dropping emails. Refer to Service logs

Screen Guide:

Clicking on the Log Number will drill into the Plant Log. The two colour coding regimes are shared with the Service Desk, read about it here.

image-20240327-235503.png

Image Removedimage-20241106-221434.pngImage Added

The General tab includes specific details related to a Plant Item Service/ Maintenance. The other tabs are the same tabs as in standard Service Logs. Check here for details on each tab.

The Plant Maintenance Log Generaltab General tab incudes includes:

  • Log No: log ID

  • Created date

  • Plant item is a required data.

  • Plant group

  • Service type: list of common types:

    • Scheduled service

    • Unplanned service

    • Accident damage

    • Improvement/modification

    • Other

  • Priority

  • Work instructions: any instruction might have.

  • Status:

    • Allocated

    • Complete

    • Finalized

    • In progress

    • Open

    • Scheduled

  • Workflow status

  • Allocated to: name an assignee.

  • Location: Location Physical location of the Plant.

  • Start due: scheduled date of the service

  • Completion due: scheduled date that the service should be completed.

  • Description of the service

  • Date/reading: where you can record the correspondence detail in this section the latest meter reading details will display, and you can enter a new meter reading:

Date

Reading

Current

The latest meter reading date.

The latest meter reading value.

Service due

the The scheduled due date, only available when Service Type is ‘Scheduled service’ or ‘Unplanned service’.

Calculated next service reading.

Start

Date

New Meter reading value

Start (time)

Time of starting.

Completion

Date when service is completed.

New meter reading value when service is completed. This is not mandatory to enter if the meter reading has not changed while on maintenance.

Next service

Date of next service

The meter reading due for the next service.

  • Parts Required/ Ordered / Received: These are memosmemorandums. Select the appropriate checkbox for reference.

Next Steps:

  • Invoicing:

    • The Service Log can be invoiced to a Productive Job, by using the Internal Sales process which can be done using the Charge Type, Charge To Job, Charge To Activity, Charge To log.

    • Or alternatively, you can transfer the Cost transactions to another Log or Job via the Perform button.

  • From the options on the Apply Filter dropdown create Custom Views to display specific fields that provide different lists for different purposes. These views will be available as additional views to the Default View.



FAQs:

Filter by label (Content by label)
showLabelsfalse
showSpacefalse
cqllabel = "placeholder" and space = "KB"

Process Flow: