Workbench Release Notes

New Features

Jobs

  • Contract Claim Accruals process enhancements:
    We have made changes to this process so that it is re-runable.

The new changes are only enabled with a new beta control parameter, until we decide to make the change permanent. Use control parameter ‘BETA FEATURE - Enable Finalise Feature for Contract Claim Accruals’

The way the process has always worked makes the generation of claim accruals essentially irreversible, because the system creates the reversal and moves the unapproved claims into the next period as part of the process. So if there is something wrong, like an unapproved claim that should have been approved, or maybe something wrong with the GL coding, the process could not be re-run.

Changes done:

  • Removed the Profit Centre filter option on contract claim accrual generation as we want to ensure that accruals are always generated for all unapproved claims.

  • When the claim accrual is generated with the [Generate & Batch] button, a batch of accrual records is created as of now, but it does not move the claims into the next period, nor does it create a reversal batch. An Accrual Record Count is populated in the screen (it is a count of Contact Claims included in the batch).

  • The claim accrual batch report can be run and checked, and if there are any changes required, the accrual can be regenerated with the [Generate & Batch] button.

  • The claim accrual batch can be exported and if there are any problems, the accrual can be unexported and regenerated, until it is right.

  • At this stage the claim accrual records are flagged as provisional, and are not included in reporting or on the Month End tab of the Job Enquiry. This is to avoid double counting the unapproved revenue (or cost) in the period.

  • Then, when the claim accrual batch is exported successfully, a new function in the claim accrual screen is available to Finalise the batch. This does the following:

    • moves the claims into the next period

    • creates the reversal batch

    • removes the provisional flag on the accrual records

  • Things to consider:

    • the system does not allow a new batch to be created if either
      (a) there is an existing unfinalised batch for that FinCo and period or
      (b) there are no unapproved claims for that FinCo (i.e. the accrual batch would be empty)

    • Regenerating accruals removes the existing accruals before generating new ones.

Contract Claim accrual process.mp4


Feature Revisions

Jobs

Dockets & Daysheets

Purchasing

  • Vouchers

Subcontracts


Plant


Billing


Quotes

Service Desk

Month End

Administration


Integration

Business Central/WIISE

Xero

Upvise 