Overview:
The Cost Sheet is used to build up an aspect of the quote costs, for example 'Stage 1' of the quoted work. A quote may include multiple sheets as displayed on the Quote's Cost Sheets tab.
Screen Guide:
Main
Create or edit attributes for a Cost Sheet.
Sequence is a numeric used for the the list displayed on the Cost Sheets tab. This auto increments by 10 on a new cost sheet.
Cost Sheet is a name to identify this cost sheet.
Work Centre for the Cost Sheet. Leave blank unless you are equating a Work Centre with a whole cost sheet. This would only be the case if you were using Job Work Centres and were identifying the work from a chronological perspective. The Work Centre can be entered on the individual Cost Sheet transaction lines or will default from the Activity Code.
Price Code sets the default retail price code for all the Cost Transactions if you are pricing from the individual Cost Sheet transaction lines.
You can change the Price Code by entering a new code. The default is specified by the Quote Default Price Code control parameter.Activity Group to be used in defaulting the cost line Work Centres.
Job for the Cost Sheet, a valid Job being the Header or SubJobs linked to the Quote Header.
Entered By is the person capturing the Cost Sheet.
Description in brief for this Cost Sheet.
Details allows for a more detailed narrative of the cost sheet if required, with basic formatting support.
Summary
Provides a summary aggregated by Cost Category. 'General' is the default cost category if not explicitly set up on the activity.
Unit is displayed next to each Cost Category
Quantity displays the total quantity by Cost Category
Cost aggregates the cost sheet line Total Cost values by cost category.
Sell aggregates the cost sheet line Total Selling values by cost category.
Margin is calculated as the Sell - Cost for the cost category.
Margin% is calculated as the (Sell - Cost)/Sell for the cost category.
Markup% is calculated as the (Sell - Cost)/Cost for the cost category.
Lines
The Lines tab support the breakdown of costs in 3 Input style, each supporting further levels of flexibility and sophistication. The Lines tab is only displayed after saving the Main tab.
Input style for this cost sheet.
At Activity, Work Centre allows for a basic breakdown using activities only.
At Cost Element allows for a breakdown by the standard types - Activity, Labour, Plant, Stock
At Revenue & Cost Element allows for grouping the cost elements lines into a single revenue line
The input style is fixed after saving. The default style At Revenue & Cost Element is the most flexible.
Grid Sort specifies the row sort order, the default is Sequence No.
Sequence No is the entered sequence
Activity, Work Centre is a combined sort in this precedence
Work Centre, Activity is a combined sort in this precedence
Expand | ||
---|---|---|
| ||
Allows for a basic breakdown using activities only.
|
Expand | ||
---|---|---|
| ||
Allows for a breakdown by the standard types - Activity, Labour, Plant, Stock.
The cost line fields specify the following.
|
Expand | ||
---|---|---|
| ||
Allows for revenue lines each with a breakdown by the standard types - Activity, Labour, Plant, Stock as Cost lines. There is an option to add a Bill Of Materials allows selection of a defined Bill Of Materials (BOM) item, and the [+] button adds the constituent BOM lines into the selected revenue cost linesas a Revenue Line which will use the selling price from a Price Code if the BOM item is included in the Price Code. Any Price Code markup/rate definition for the BOM header Item takes precedence over the natural markup/rate dictated by the BOM header Item. The revenue line fields specify the following.
The sub-grid cost line are the cost constituent of the revenue line and the fields specify the following. There is an option to add all the cost lines that make up a BOM within an existing Revenue line, as below.
When using At Revenue and Cost Element, on budget creation, Job Work Centres will be created There are two options to default Work Centre on Cost Lines, that are controlled by setting [Revenue Cost Element Work Centre Default] Options:
When using At Revenue and Cost Element, on budget creation, all cost lines in the Cost Sheet under the same Revenue line, will be created in the Budget under the same Revenue line (with same Job Work Centre). |
Expand | ||
---|---|---|
| ||
|
Expand | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Below are the supported symbols to be used on a Calculation column. Supported symbols
|
Next Steps:
FAQs:
Filter by label (Content by label) | ||||||
---|---|---|---|---|---|---|
|
Process Flow: