Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 18 Next »

Change log:

17/04/2023 RN 4.6.5 Site Address
29/05/2023 RN 4.6.8 Site Contact
12/06/2023 RN 4.6.9 Project Stage and Project Group

Overview:

Projects in Upvise are equivalent to Jobs in Workbench. Projects are one of the core functions in Upvise containing a large amount of data including but not limited to:

  • Daily Diaries (Timesheets)

  • SWMS

  • Site Inspections

  • Toolbox meetings

  • Site Inductions

  • Emergency Response Plans

  • Health and Safety Data etc.

In Upvise Projects, you can also attach documents and photos, organise project milestones, attach and mark up drawings and plans, and schedule staff and equipment to the project Calendar.

They are created in Workbench and automatically imported into Upvise.

Integration

 Syncing Workbench Jobs to Upvise Projects

Workbench Jobs will sync to upvise as a project as long as the “Req. Sched.” field is ticked in Job Maintenance.

To finalise a Project, in workbench you need to tick “finalised” in Job details. The Upvise Project will Auto-archive in the next scheduled sync and no longer will be selectable on forms.

The Req. Sched flag should be retained.

 Workbench Site Address & Site Contact Integration

The workbench Site address syncs to the Project address fields in Upvise.

  1. Turn on control parameter “BETA FEATURE - Structured Addresses” by changing the value to “Yes”

    Turns on Structured Addresses within Workbench application and integrations allowing the address information to seamlessly sync to Upvise in the correct Address fields. You will notice now on your workbench Jobs, that the address structure is easier to read and enter data.

2. When selecting "Site Address" on the workbench job, this auto-populates the address fields on the job in workbench 

  • Alternatively you can manually enter the site address details into the address fields:

    • Street Line 1

    • Street Line 1

    • Suburb

    • City

    • State

    • Country

    • Post Code

  • You can also run a utility “wbUtilityInitialiseStructuredJobAddresses” to bulk populate the addresses from pre-selected site address field.

3. You can also select the “Site Contact” in the addresses tab to update your client contact in the Upvise Project.

4. After the updates have been made for the site address and site contact, click “Save” and then navigate to the upvise integration screen to trigger a sync by clicking “export/Import”. This will occur automatically every hour.

5. In upvise, you will see that the Project address and site contact is now updated, check this by:

  • go to project

  • click “Info”

  • you will see the address and client contact are both updated

see “Map & Geocoding” to geocode your addresses below.

 Project Integration- Other

Below is the field mapping for Project Integration from Workbench to Upvise.

Workbench

Upvise

Details

Job Code

Project Code

Description

Name

Company

Client Company

Will sync the Company to Upvise if it does not exist (regardless of Other flag)

Start Date

Start Date

Start date is required in order to set dates in Upvise. The start Date defaults to Job Created Date, this will default to Todays Date if not set. Only syncs on new projects

Expected Completion Date

End Date

Defaults to Start Date (as above) + 1 year if not set. Only syncs on new projects

Job Manager

Owner

Can be controlled via Upvise Project Owners Sync Disabled setting 

Job Status

Stage

Stages manually added in Upvise will be overwritten, workbench is the master file for this configuration. 

Job Type OR Profit Centre

Group

Can be controlled via Upvise Group Sync Basis setting

Finalised

Archived

When updating an existing project

Addressing

Street

Structured Addresses Enabled: "StreetLine1, StreetLine2, Suburb". Structured Addresses Disabled: SiteAddress.Address1

City

Structured Addresses Enabled: "City". Structured Addresses Disabled: SiteAddress.Address2

State

Structured Addresses Enabled: “State” <28/03/2023> add

Site Address Post Code

ZipCode

Country

Structured Addresses Enabled: "Country". Structured Addresses Disabled: SiteAddress.Address4

Site Contact

Client Contact

Find and replace the contact if any changes are made in WB.

Details

Note

Parent Job

Custom Field. (Parent Job) 

Only syncs the Job Code

Stock Location

Custom Field. (Stock Location)

Syncs as Job.StockLocation.JobCode:Job.StockLocation.Description

Activity Group Code

Custom Field. (Activity Group)

Jobs- docket cost schedules

Custom Field. (Product Categories) 

This concatinates the schedule codes into a string and is used on data entry for dockets.

Jobs- output schedules

Custom Field. (Output Categories) 

This concatinates the schedule codes into a string and is used on data entry for outputs.

Screen Guide:

 Navigating to Projects

Navigate to Projects in upvise by clicking on the Menu button and selecting Projects.

You can sort by using the column filter in Upvise Projects or by using the global search function at the top of your screen in the web.

The projects appear in the project list. If you have appropriate permissions, you can see all projects by changing the user in the top right corner from your user to “Everyone.” Click on the Client field to see their details in Contacts. Administrators can see all projects, as can managers, Standard users can only see projects they are the owner of or projects with no owners.

Clicking on a project line takes you to the project details:

  • You can edit, attach files, or add Tasks, Forms, Jobs, and other functions using the menu bar at the top and selecting the desired icon.

  • To see and add Jobs or Calendar events, select the appropriate option. Use the + button at the top to add more of the item you selected.

  • Forms are also grouped together for quick access. This is especially useful for frequently accessed forms like diaries and site meetings.

 Dashboard

The dashboard is a convenient visual representation for various project indicators.

  • Timeline shows a Gantt chart of Project Milestones (Job Work Centres in Workbench). Clicking on a line navigates to that project. You can access individual project milestones in Upvise by clicking on the project, Schedule and you will see more details for the Project Schedules (Job work centres).

    • The Schedule times are dependant on what is set up in workbench so ensure that these are set up first before syncing the project

    • Project Schedules (work centres) only sync once from Workbench. If you delete a work centre from a Job in workbench, you need to manually delete the work centre in Upvise. If you add a new work center to the Job in Workbench, you can sync this across in Upvise Integration.

  • Punch Items shows statistics and charts for punch items across available projects. Click on a segment to see the details of that project.

  • Time shows a chart of hours attributed to each project.

  • Budget shows budgeted amounts for each project. This data is not synced across from Workbench, budget data will manually need to be entered in this space.

 Map & Geocoding

The Map selection provides an insert of Google Maps with available projects plotted on the map based on their Geocode.

To bring new projects into the map view, go to the No geocode tab, then click Batch Geocode in the top menu selection area.

This process will search for missing geocodes based on the addresses entered and update the map. A geocode can only be generated if the street address and state fields are populated, missing critical address information will result in no geocode generating.

 Scheduler

This feature shows the schedule for the day across all projects. Assigned staff appears next to the project in the list with their start time; clicking on the time slot shows the details of the assignment. You can see a list of unassigned staff/users on the right side of the screen in blue.

You can duplicate from day to day using the double box icon in the top menu bar. The icon to the right of that enables us to send quick messages via push notifications to selected employees/staff. Use the Planned Schedule feature in Timesheets to see greater lengths of time and to assign and manager staff in bulk. You can also refine the display by project Groups. New groups are added in Project Options.

Project Schedules will be visible in Timesheets Module- Planned Schedule view also.

 Project Options

You can manage specific project controls (settings) and user rights in the “Options” section of projects.

In here, you can control User Rights as well as add Project specific custom fields to your project.

Next Steps:

After reviewing your projects, you can complete Forms, enter Timesheets, and manage your Equipment .


Process Flow:

  • No labels