Workbench Release Notes:
Beta Release 4.5.10.1
Scheduled Release - 2 August 2021
New Features
Plant
Plant Bulk Meter Readings new screen: This new screen under Plant provides a view of meter readings across plant items, and supports bulk entry of meter readings for multiple plant items. It assumes that Meters have been configured and implements the same validation as entering readings on individual plant items.
Feature Revisions
General
Standard site map profile: Inwards Goods Entry and Job Outputs Entry menu items can now be accessed directly from their respective List screens, and these menu items are not needed anymore.
JSON serialization error poping up on My Approval List when having a large number of documents to approve has been rectified.
Jobs
Forecasting: A new column that displays the Purchase Order and Work Order types has been added on the pop-up screen for Expected Commitments column.
Job Enquiry: In the Details tab, the Cost % column calculation was incorrect in some cases and this has been rectified.
Budget: On Budget lines there is a direct link to Work Orders Lines or Purchase Order Lines that have been created from the budget line. The link is through an . It has been changed to only display if there actually are WO or PO lines to display.
Purchasing
Purchase Requisitions: When opening the Purchase Requisitions screen, the default filters were not been applied. This has now been rectified and the list of Purchase Requisitions is the result of the default filters.
Purchase Orders: Rectified an issue when recosting a Purchase Order with catalogue items. The recosting process was using the incorrect catalogue. This issue only happened when besides a standard Catalogue, the stock item was in a Job Procurement List.
AP Vouches
Additional filters were added on Docket Lines Tab, for ease of use:
Added ‘Docket Header Job’ filter
Added PO Number filter - displayed approved docket commitment POs only
Added PO Docket filter - possible values are Yes and No (to display all PO'd lines)
Changed ‘Job’ filter label to ‘Line Job’
Changed ‘Code’ filter label to ‘Line Code’
Added ‘Line Description’ filter with "like, starts with, ..." options to find the data you are after
Schedule filter now lists only Docket Cost Schedules
The number of unreconciled Dockets for the Voucher’s Supplier is now displayed on the Docket Lines tab, same as PO Lines and Stock Receipted tabs.
Subcontracts
Improved navigation from Jobs list to Subcontracts. It now displays a breadcrumb menu for easy access back to Job list after opening a Subcontract from a Job Subcontract elypsis menu:
Timesheets
Start and End validation when Control Parameter 'Validate Timesheet Start and End Times' is set to Yes:
When saving a timesheet, the system now checks that Quantity is consistent when a start and end time is populated.
When saving a timesheet and a validation error pops up, the system keeps the line details. Previosuly, details were being deleted.
Start and End validations are ignored if the activity sub-type is either “KMS“ or “Leave“.
Quotes
Integration
Upvise
Time based subforms in Upvise now allow the selection of Time Codes, in those cases where the activity allows a Time Code selection. The Time Code selection on the timesheet line will be synced back to Workbench.
Time entry subforms enhanced are:Project hours subform
Operator hours with equipment subform
Admin Hours
Equipment Hours