Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

(Video)

Overview:


Screen Guide:

  1. Open the Plant Scheduler screen and type into the Job Filter part of the Plant code or Job Description to get a list of Jobs.

  2. Drag and drop the job on to the Plant item that you want to schedule.

Image Added


3. Select Save to keep the event.

4. Double click on the Job to change the details of the event.

Image Added

Next Steps:



Related Pages:


FAQs:

Filter by label (Content by label)
showLabelsfalse
showSpacefalse
cqllabel = "placeholder" and space = "KB"

Process Flow: